Guide · thermal

How to spec a thermal liner-top packer for SAGD.

A practical checklist so your first vendor email can be priced.

SAGD liner-top packers live where host casing meets liner, steam cycles move metal, and solids settle on seals. Speccing one is a systems problem: packer + expansion joint + shoe/flotation often travel together.

Send these fields

  • Host casing OD / weight / grade
  • Liner OD / weight and approximate top depth context
  • Max operating temperature and steam cycle notes (SAGD vs CSS)
  • Differential pressure across the liner top
  • Debris-seal preference and any known solids issues
  • Expansion joint stroke (or lateral length + temperature change for estimate)
  • Metallurgy / elastomer constraints
  • Qty and need-by date

With that list, Western Completions can quote a debris-seal liner-top configuration and flag companion tools in the same response.

Debris-seal liner-top packer → · Expansion joints →

FAQ

What temperature should I specify?

State the maximum operating temperature for the liner-top environment, not only steam generator outlet.

Do I always need a debris seal?

Many SAGD liner tops see solids settling. Confirm against your solids and workover plan.

Next step

Send the envelope. Get a quote within 1 business day.

Casing size, temp/rating, well type, qty, and timeline — enough for an engineer-reviewed response.

Request a quote

Company, name, and phone required. Quote within 1 business day. Alberta / Western Canada focus.

Thanks — we received your request. Expect a response within 1 business day. Call {{QUO_NUMBER}} if the well is on the critical path.
Call Request quote